Here are the various stages of our house being built. We moved into the house on October 26th, 2001! To date, everything is all unpacked and we couldn't be happier! Everything is absolutely perfect with the house and with Jamye and I. :-) This is our hole on August 1st. 
This is the foundation on August 3rd. August 7th, they are filling in the sides of the foundation w/ dirt. :-) August 20th they started framing. We are expecting it to take 2 weeks to complete all the frame. :-) August 21st-We have a floor and one wall! 
3 days of framing and the first floor is framed! (August 23rd) August 25th. Roof materials are delivered and framing is still going up. August 28th they started the second floor. August 31st-It actually looks like a house! Framing is almost completely finished. Just a few minor things to do inside. 
Framing is complete! September 5th we did a midnight raid to the house. Pictures weren't wonderful but we got to see everything framed out. The pic is the entertainment center! September 17th we had our presheetrock meeting. We showed up and was surprised that we already had brick! Next 2 pictures were taken September 21st. Sheetrock was started and the house was painted! ...this picture is looking down into the living room from the 2nd floor. 
|